Update on South Porch

The builders have been getting on with the work on the South Porch. The
thresholds have been replaced,the floor has been levelled and the tiling
is being relaid. A rail has been positioned to help those with mobility
problems. The old inner door, weighing over 180 kilos, has been moved to
the West Porch where it will be hung and kept because of its historic
ironworks.